Electrical reconstruction of Budapest Waterworks SZÜM power houses (4 power houses)
Objectives:
Electrical reconstruction of the waterworks of Budapest (4 power houses)
Challenge:
The engine house must ensure water supply during renovation by designing proviser solutions
Solution:
Reconstruction of the Budapest Waterworks’ SZÜM powerhouses (4 powerhouses) with the following content:
– 32 (4*8) fields SM6 equipment 10kV
– 16 (4*4) fields xEnergy equipment 0,4kV
– 4 (4*1) fields xEnergy equipment PLC cabinet
– various switchboards
– on-site works (cabling, lighting installation, etc.)
– integration of newly installed equipment into existing plant management system
Result:
After the necessary measurements and checks have been carried out, the machine room is now running smoothly with the new equipment.