MOL LUB Almásfüzítő 2. station electrical reconstruction

Objectives:

MOL LUB Almásfüzitő site 2 transformer station replacement of outdated systems, modernisation of internal metering, development of fire alarm and electrical monitoring system for reliable and safe operation.

Challenge:

Preparation of new design documentation due to lack of plans to record existing conditions, management of contingencies during retrofits, ensuring continuous operation.

Solution:

Carry out works to the design plans based on a thorough site design survey with the following contents:
– installation of modern disconnectors in transformer chambers
– fabrication and installation of existing low-voltage distribution equipment and fitting of controls
– Manufacture and installation of SCADA control cabinets, extension of the display system
– manufacture and fitting of internal metering cabinets to existing systems
– testing and modification of fluid power control
– installation of fire alarm systems

Result:

After completion of the construction works, after the necessary measurements, tests and trials, and after the trial run, the station, converted using modern elements, can now be operated remotely and safely.