Arconic-Köfém Kft. object 82, compressor plant electricity supply

Objectives:

Arconic-Köfém Kft. Construction of electricity supply for compressor plant

Challenge:

To be completed within the tight deadline set by the client.

Solution:

Installation of electricity supply to compressor plant 82 with the following content:
– Construction of the earthing and lightning protection system of the building
– Construction of cable traces and laying of medium voltage cables
– Construction of 2 transformer chambers, installation of 2 dry transformers of 1600 kVA
– Installation of 2500 A EAE aluminium encapsulated rail bridge
– Fabrication and installation of a 2×3 2,500 A MODAN 0.4 kV distribution system
– 0,4kV cabling

Result:

Smooth operation of the newly commissioned Compressor Station after the necessary check measurements have been carried out.