Budapest Waterworks Ltd. Electrical reconstruction of the Ferihegyi Road powerhouse

Objectives:

Budapest Waterworks Ltd. Implementation of the electrical reconstruction of the Ferihegyi út power house

Challenge:

The power house must ensure water supply during the renovation by providing water supply solutions

Solution:

Fővárosi Vízművek Zrt. The reconstruction of the Ferihegyi Road powerhouse with the following content:
– manufacture, installation and integration of new main distribution equipment into the plant management system (9+9 field x Energy equipment, NFE1-2 diesel switchgear cabinet; frequency converter and metering cabinet)
– cabling, lighting installation

Result:

With the necessary measurements and checks carried out, the power house is now running smoothly with the new equipment.