Medium voltage power supply for Létavértes Solar Park

Objectives:

Construction of the internal medium-voltage grid for the 5MWp solar farm and connection to the power plant grid in the framework of a greenfield project

Challenge:

Connection of the power plant to the grid, in line with existing equipment and systems, with minimum disruption to supply.

Solution:

Development of the internal network of the solar power plant by installing 4 concrete enclosure transformer stations and 1 settlement metering station, power and optical cabling, and extension of the EON Létavértes 120/20kV station 20SRTO type medium voltage equipment by 1 field, development of protection system, extension of control system, development of MAVIR settlement metering.

Result:

Completion of the construction works, after the necessary tests and trials, and the start of uninterrupted power generation following the trial operation.