MOL Zalai Finomító Gumibitumen Gyár Medium voltage power supply design and construction
Objectives:
Design and construction of a medium voltage electricity supply system for MOL Zalai Finomító Gumibitumen Gyár
Challenge:
Connection to the existing electrical system of the refinery while ensuring continuous and uninterrupted operation.
Solution:
Design and construction of a medium voltage power supply for Gumibitumen Factory:
– modification of existing medium voltage distribution equipment, installation of 2 fields RM6-NBI
– Construction of cable trail and laying of medium voltage cable
– Construction and installation of a KVGY transformer station with concrete housing (RM6-NBI, equipped with 1600kVA oil transformer)
– Manufacture and installation of a 0,4 kV 6-field 2000 A distribution installation
– 0,4kV cabling
Result:
Start-up of the rubber bitumen plant without disturbing the existing operating equipment of the refinery
Recent Comments