Objectives:

MPK POLYOL Plant Secondary installation and design of medium-voltage distributors

Challenge:

To efficiently organize the difficult coordination process with the customer and end user representatives during the design process, as well as the high volume, high complexity production.

Solution:

Secondary assembly and design of MPK POLYOL plant medium voltage distribution boards with the following content:
– 136 cells Siemens NXAir type medium voltage equipment
– 10 field Scada cabinet
– 10 field EFIR cabinet

Result:

Complete and complete installations, with all details properly functioning after factory acceptance.