MPK Zrt. Medium voltage reconstruction of LDPE-2 plant
Objectives:
MPK Zrt. LDPE-2 plant medium voltage reconstruction
Challenge:
To organise and implement the on-site installation activities during the short shutdown of the plant and to develop a specific retrofit solution.
Solution:
MPK Zrt. LDPE-2 plant during maintenance shutdown with the following content:
– Retrofit of 12 medium voltage circuit breaker trolleys;
– Manufacture of 23 secondary panels;
– Assembly of 23 secondary cell doors
– fitting of the new protection system to the existing monitoring system, implementation of operational tests
Result:
On time delivery thanks to good preparation and labour organisation.