Püspökladány Solar Park Medium-voltage power supply

Objectives:

Construction of the internal medium-voltage grid and connection to the grid of a 5MWp solar farm to be built as part of a greenfield project

Challenge:

Connection of the power plant to the grid, in line with existing equipment and systems, with minimum disruption to supply.

Solution:

Extension of the internal network of the solar power plant by installing 4 concrete enclosure transformer stations and 1 metering station with settlement metering, power and optical cabling, extension of the EON Püspökladány 120/20kV station 20SRTO type medium voltage equipment with 1 field, protection system, extension of the control system, MAVIR settlement metering.

Result:

Completion of the construction works, after the necessary tests and trials, and the start of uninterrupted power generation following the trial operation.