Objectives:
MOL LUB Almásfüzitő site 1 and 3 transformer stations replacement of outdated systems, modernisation of internal metering, development of fire alarm and electrical monitoring system for reliable and safe operation.
Challenge:
Preparation of new design documentation due to lack of plans to record existing conditions, management of contingencies during retrofits, ensuring continuous operation.
Solution:
Carry out works to the design plans based on a thorough site design survey with the following contents:
– installation of modern disconnectors in transformer chambers
– fitting of controls to existing low-voltage distribution equipment
– manufacture and installation of SCADA control cabinets, design of display systems
– Manufacture of internal metering cabinets, fitting to existing systems
– testing and modification of power control systems
– installation of fire alarm systems
Result:
On completion of the construction works, after the necessary measurements, tests and trials, and following trial operation, the stations converted using modern components can now be operated remotely and safely.